Method for producing a primary material for a cutting tool

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10710182
APP PUB NO 20170282266A1
SERIAL NO

15508255

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a primary material for a cutting tool, for example a primary material for a saw blade or a saw band, in which a band-shaped carrier of a metal carrier material and a wire of high-speed steel are continuously brought together along a lateral edge of the band-shaped carrier and transported into a welding device and the band-shaped carrier is welded to the wire along the lateral edge of the carrier to produce a bimetal band. The band-shaped carrier and the edge wire are welded to one another by at least a first welding device, which is arranged on one side of the band-shaped carrier, and at least a second welding device, which is arranged on the opposite side of the band-shaped carrier.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VOESTALPINE PRECISION STRIP GMBH3333 BÖHLERWERK

International Classification(s)

loading....
  • 2015 Application Filing Year
  • B23K Class
  • 2354 Applications Filed
  • 1765 Patents Issued To-Date
  • 74.98 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances20152016201720182019202020212022202320240255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harrer, Manfred Linz, AT 4 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • B23K Class
  • 0 % this patent is cited more than
  • 5 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges804481103101 - 1011 - 2021 - 3031 - 40050100150200250300350400450500550600650700750800850

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 14, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2032