Electrical connector with reinforced rib stiffener

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9867302
SERIAL NO

15617383

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical connector and the buckle assembly thereof. The buckle assembly includes a stiffener provided with a frame opening for receiving an insulating body of the electrical connector, and a load plate with a rear end pivoted to the stiffener. The stiffener has a reinforce rib in front of the frame opening. The reinforce rib has a raised portion protruding upward from an upper surface of the stiffener, and an extending portion is formed by horizontally extending from the raised portion. The load plate has a through hole for receiving the chip module, a receiving hole in front of the through hole, and two receiving holes behind the through hole. Each receiving hole allows a locking member to pass therethrough to fix the load plate onto the stiffener.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LOTES CO LTDNO 15 WUSYUN STREET ANLE DISTRICT KEELUNG 204

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
He, Yin Liang Keelung, TW 5 12
Zhang, Hao Keelung, TW 1170 5565

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00