Method and station for converting a flat substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10688678
APP PUB NO 20170266832A1
SERIAL NO

15532125

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for converting a flat substrate (W) in a station (3) for converting a flat substrate (W) that includes a rotary cutting unit (9) and at least one rotary deformation unit (7, 8) positioned upstream of the rotary cutting unit (9) in the direction of movement (L) of the flat substrate (W), the method including: determining the conversion parameters of the flat substrate (W), such as the deformation layout and cutting layout; choosing a sleeve (13) carrying a form for carrying out the deformation depending on the deformation layout; mounting the sleeve (13) on a mandrel (12) in the rotary deformation unit (7, 8); choosing the cutting tools (91, 92) depending on the cutting layout; mounting the cutting tools (91, 92) in the rotary cutting unit (9); and starting the conversion of the flat substrate (W).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOBST MEX SAROUTE DE FARAZ 3 MEX 1031

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Clément, Philippe Penthalaz, CH 5 1
Robadey, Pierre St Sulpice, CH 9 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00