Method for producing electrochemical cells of a solid-state battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10763549
APP PUB NO 20170263980A1
SERIAL NO

14917732

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing at least one electrochemical cell of a solid-state battery, comprising a mixed-conducting anode, a mixed-conducting cathode, and an interposed electrolyte, is characterized in that a mixed-conducting anode and a mixed-conducting cathode are initially produced or provided. The surface of at least one of the two electrodes is modified by way of an additional method step in such a way that the electronic conductivity perpendicular to the cell is reduced to less than 10−8 S/cm in a layer of the electrode near the surface. The anode and cathode are then assembled to form a solid-state battery in such a way that the surface-modified layer of at least one electrode is disposed as an electrolyte layer between the anode and cathode, and the mixed-conducting electrodes are thereby electronically separated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORSCHUNGSZENTRUM JUELICH GMBHFACHBEREICH PATENTE JUELICH 52425

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Buchkremer, Hans Peter Heinsberg-Schafhausen, DE 18 169
Finsterbusch, Martin Juelich, DE 3 4
Tsai, Chih-Long Juelich, DE 1 3
Uhlenbruck, Sven Pulheim, DE 5 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00