Tomography apparatus, multi-phase flow monitoring system, and corresponding methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10732017
APP PUB NO 20170261357A1
SERIAL NO

15511155

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A flow monitoring system is described for monitoring flow of a mixed-phase sample comprising at least a first phase and a second phase having different electrical conductivities, the second phase being a liquid or a gas and substantially electrically non-conductive and the first phase being a liquid and having a conductivity higher than the second phase. The system comprises: a conduit through which the mixed-phase sample can be arranged to flow; tomography apparatus arranged to generate tomography data indicative of at least a first conductivity profile of at least a portion of a first cross section of the mixed phase sample when flowing through the conduit; a flow meter arranged to detect flow of the first phase though the conduit and provide a flow signal indicative of a flow velocity of the first phase; and processing means adapted to calculate, from said data, a fraction of said first cross section occupied by the first phase, and calculate, from said fraction and said flow signal, a volumetric flow rate of the first phase through the conduit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSITY OF LEEDSLEEDS LS2 9JT

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Faraj, Yousef Huddersfield, GB 1 17
Jia, Jiabin Central Scotland, GB 2 28
Wang, Mi Leeds, GB 23 223
Wang, Qiang Leeds, GB 762 5596

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 4, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 4, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00