Dilation catheter assembly with rapid change components

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10625062
APP PUB NO 20170259048A1
SERIAL NO

15278588

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A dilation catheter system includes a body and a shaft assembly. The shaft assembly extends passed a distal end of the body. The shaft assembly includes a fixed guide member, a catheter shaft, a dilator, a removable guide member, and a guidewire. The fixed guide member is fixed relative to the body. The dilator is fixed to the catheter shaft. The catheter shaft is operable to expand the dilator. The removable guide member is operable to selectively attach to the body. The catheter shaft is slidably disposed along the removable guide member such that the catheter shaft is configured to translate along the removable guide member. The guidewire is slidably disposed within the removable guide member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ACCLARENT INC31 TECHNOLOGY DRIVE SUITE 200 IRVINE CA 92618

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chan, Randy S San Jose, US 49 4771
Matlock, George L Pleasanton, US 61 1463
Ngo-Chu, Don Q Irvine, US 28 563
Pham, Tuan Montclair, US 85 2485
Phillips, Jason R Rancho Santa Margarita, US 11 469

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 21, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00