Carbon dioxide trapping device and method capable of producing electricity

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10818953
APP PUB NO 20170256812A1
SERIAL NO

15115980

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus and process are provided for electricity production and high-efficiency trapping of carbon dioxide, using carbon dioxide within combustion exhaust gas and converging technologies associated with a carbon dioxide absorption tower and a generating device using ions which uses a difference in concentration of salinity between seawater and freshwater. It is expected that enhanced electrical energy production efficiency, an effect of reducing costs for the operation of a carbon dioxide trapping process, and electricity production from carbon dioxide, which is a greenhouse gas, can be simultaneously achieved by increasing the difference in concentration using an absorbent for absorbing carbon dioxide.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA INSTITUTE OF ENERGY RESEARCHDAEJEON 34129

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jeong, Nam Jo Jeju-si, KR 14 101
Kim, Chan Soo Seoul, KR 27 155
Kim, Han Ki Jeju-si, KR 14 441
Kim, Young Eun Daejeon, KR 26 45
Nam, Sung Chan Daejeon, KR 12 14
Park, Sung Youl Daejeon, KR 3 3
Yoon, Yeo Il Daejeon, KR 6 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 27, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 27, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00