Expansion joints for a tubular transportation system
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Aug 23, 2022
Grant Date -
Sep 7, 2017
app pub date -
Mar 7, 2017
filing date -
Mar 7, 2016
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A tubular structure includes at least one exterior tube and at least one interior tube, at least a portion of the interior tube is disposed within the exterior tube. The tubular structure further includes at least one expansion joint provided between the exterior tube and the interior tube and the expansion joint allows lateral expansion or contraction of the exterior tube and the interior tube and maintains a pressure within the exterior and the interior tubes.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
DP WORLD FZE | JEBEL ALI DUBAI |
International Classification(s)

- 2017 Application Filing Year
- F16L Class
- 2082 Applications Filed
- 1478 Patents Issued To-Date
- 70.99 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Cole, Blake | Redondo Beach, US | 5 | 10 |
# of filed Patents : 5 Total Citations : 10 | |||
Pearse, Luke | Manhattan Beach, US | 6 | 21 |
# of filed Patents : 6 Total Citations : 21 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 2 Citation Count
- F16L Class
- 75.74 % this patent is cited more than
- 3 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Feb 23, 2026 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Feb 23, 2030 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Feb 23, 2034 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
