Semiconductor device and PLL circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10291238
APP PUB NO 20170250692A1
SERIAL NO

15441936

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An object is to improve Power Supply Rejection Ratio in a PLL circuit. A proportional path 103 is provided in a first power supply system 101 and outputs analog proportional signal AP according to a detection signal DET. An integral path 104 is provided in a second power supply system and outputs an analog integral signal AI according to the DET. A CCO driver 16 is provided in the first power supply system 101 and outputs control current ICCO according to the AP and the AI. A CCO 17 is provided in the second power supply system 102 and outputs an output signal Fout according to the ICCO. A phase frequency detector 11 is provided in the second power supply system 102 and configured to detect a phase difference between a reference signal Fref and a signal FM obtained by feeding back the Fout and then outputs the DET.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RENESAS ELECTRONICS CORPORATION2-24 TOYOSU 3-CHOME KOTO-KU TOKYO 135-0061

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirai, Yoshitaka Tokyo, JP 13 98
Motozawa, Atsushi Tokyo, JP 8 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00