Concrete towers manufacturing method for wind turbines and concrete tower for wind turbine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10738499
APP PUB NO 20170247901A1
SERIAL NO

15443606

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a manufacturing process in situ of concrete towers for wind turbines which enables executing a design of concrete tower manufactured in situ by means of climbing formwork, which reduces the execution time of the concrete tower, where the invention also relates to the associated concrete tower for wind turbine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORDEX ENERGY SPAIN S A31395 BARASOAIN NAVARRA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aristegui, Lantero Jose Luis Navarra, ES 19 54
Arlaban, Gabeiras Teresa Navarra, ES 44 185
Biedma, Garcia Manuel Madrid, ES 2 4
Carrillo, Alonso Luis Madrid, ES 2 4
Garcia, Maestre Ivan Navarra, ES 11 40
Garcia, Sayes Jose Miguel Navarra, ES 40 127
Nunez, Polo Miguel Navarra, ES 41 123

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00