BUSHING FOR MANUFACTURING GLASS FIBER
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Aug 31, 2017
app pub date -
Jun 8, 2015
filing date -
Jun 10, 2014
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
The present invention is a bushing for manufacturing a glass fiber that includes a base plate, a plurality of nozzles for discharging molten glass, and a nozzle group in which the plurality of nozzles are arranged in lines, being bonded to the base plate, wherein nozzles constituting at least one nozzle array among nozzle arrays of outermost layers of the nozzle group are plugged to a half or more of a nozzle length from a tip in depth. The glass-fiber-production bushing plate makes long-term, stable discharge of a uniform glass flow possible.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
TANAKA KIKINZOKU KOGYO K K | TOKYO 100-6422 |
International Classification(s)

- 2015 Application Filing Year
- C03B Class
- 530 Applications Filed
- 395 Patents Issued To-Date
- 74.53 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
OSAWA, Ichizou | Kanagawa, JP | 2 | 3 |
# of filed Patents : 2 Total Citations : 3 | |||
OSAWA, Toshihiro | Kanagawa, JP | 5 | 5 |
# of filed Patents : 5 Total Citations : 5 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 1 Citation Count
- C03B Class
- 37.76 % this patent is cited more than
- 8 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Feb 28, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Feb 28, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
