Polyester-modified polybutadienols for producing polyurethane elastomers and thermoplastic polyurethanes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11066508
APP PUB NO 20170240684A1
SERIAL NO

15504493

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to polyurethanes obtainable by reaction of (a) polyisocyanates A selected from modified or unmodified 4,4′-methanediphenyl diisocyanate, higher nuclear homologs of 4,4′-methanediphenyl diisocyanate, isocyanated groups containing prepolymers based on 4,4′-methanediphenyl diisocyanate, and mixtures thereof, with (b) compounds having at least two isocyanate-reactive hydrogen atoms, comprising (b1) block copolymers formed from a polybutadienol and a cyclic ester as component B1, and (b2) low molecular weight extenders or crosslinkers each having a molecular weight of 62 to 500 g/mol as component B2.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BASF SE/ LUDWIGSHAFEN 67056

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dilcher, Jan Muehldorf, DE 2 6
Eling, Berend Lemfoerde, DE 67 448
Fink, Irina Hamburg, DE 2 5
Luinstra, Gerrit Hamburg, DE 17 215

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 20, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 20, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00