Method and system for additive manufacturing using a light beam

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10688561
APP PUB NO 20170239724A1
SERIAL NO

15504234

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The method comprises the steps of: a) supplying building material; and b) fusing the building material using a light beam (2); wherein steps a) and b) are carried out so as to progressively produce the object out of the fused building material. In step b), the beam (2) is projected onto the building material so as to produce a primary spot on the building material, the beam being repetitively scanned in two dimensions in accordance with a first scanning pattern so as to establish an effective spot (21) on the building material, said effective spot having a two-dimensional energy distribution. The effective spot (21) is displaced in relation to the object being produced to progressively produce the object by fusing the building material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ETXE-TAR S ASAN ANTOLIN 3 (GUIPÚZCOA) ELGOIBAR 20870

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Diaz, Javier Guipuzcoa, ES 6 26
Dominguez, Jesus Guipuzcoa, ES 2 11
Sancho, Paula Guipuzcoa, ES 3 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00