Crossbow with Step
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
N/A
app pub date -
Apr 10, 2017
filing date -
Sep 10, 2012
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
In one or more embodiments, a prod may include a rail-engagement portion configured to engage a rail extending along a longitudinal axis extending proximally from the rail-engagement portion; a peripheral surface including a foot-engagement region; and, optionally, a bow-engagement portion configured to engage a bow or a bow limb. In one or more embodiments, prod or crossbow accessory engages a crossbow, wherein the prod or crossbow accessory includes a first foot-engagement region and a second foot-engagement region.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
MCP IP LLC | SPARTA WI |
International Classification(s)

- 2017 Application Filing Year
- F41B Class
- 231 Applications Filed
- 190 Patents Issued To-Date
- 82.26 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
McPherson, Mathew A | Norwalk, US | 246 | 2483 |
# of filed Patents : 246 Total Citations : 2483 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- F41B Class
- 0 % this patent is cited more than
- 8 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Feb 17, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Feb 17, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
