Waste heat recovery power generation system and flow control method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10907509
APP PUB NO 20170234266A1
SERIAL NO

15177790

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a waste heat recovery power generation system, including: a compressor configured to compress a working fluid; a heat exchanger configured to recover waste heat from waste heat gas supplied from a waste heat source, the recovered waste heat heating the working fluid; a turbine configured to be driven by the working fluid heated by the recovered waste heat; and a recuperator configured to exchange heat between an output fluid of the turbine and an output fluid of the compressor to cool the output fluid of the turbine in which the output fluid of the compressor is branched into a first output fluid and a second output fluid of the compressor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO LTD22 DOOSANVOLVO-RO SEONGSAN-GU CHANGWON-SI GYEONGSANGNAM-DO 51711

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hwang, Jeong Ho Daegu, KR 42 199
Jeong, Cheol Rae Incheon, KR 4 16
Kang, Seung Gyu Yongin-si, KR 13 27
Lee, Eung Chan Seoul, KR 13 38
Park, Sang Sin Chungcheongbuk-do, KR 6 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 2, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 2, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00