Linear tubular motor magnetic shaft sleeve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10651710
APP PUB NO 20170229945A1
SERIAL NO

15502707

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of assembling a shaft of a magnetic motor comprising the steps of providing a plurality of magnets (210), providing a plurality of pole pieces (212), stacking (S11) said magnets and pole pieces to form a subassembly (202) having an outer surface of a first diameter, providing a precipitation hardenable stainless steel sheet material, forming said stainless steel sheet material into a tube (S20), drawing said tube to form a precision tube having an inner surface of a second diameter (S21), said second diameter being greater than or equal to said first diameter, heat treating said precision tube to form a tubular sleeve of a Rockwell C hardness of at least about 40 and a magnetic permeability of at least about 100 (S22), and inserting said subassembly axially into said sleeve (S30), thereby forming a shaft for a magnetic motor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MOOG INCJAMISON ROAD EAST AURORA NY 14052

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cardamone, David P Lansdale, US 9 73
Deirmengian, Carl Media, US 27 215
Harnsberger, Gregory M West Chester, US 2 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00