Nuclear fuel assembly top nozzle having in-core instrument insertion structure using an upper core plate hollow guide pin

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10692613
APP PUB NO 20170229198A1
SERIAL NO

15515132

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a top nozzle and a nuclear reactor in which an in-core instrument, which is supposed to be inserted through a top head of a nuclear reactor, is inserted through a guide pin for an upper core plate. In a nuclear reactor including guide pins for aligning a top nozzle for a nuclear fuel assembly with an upper core plate of a nuclear reactor, a guide hole (210) is axially formed through the guide pins (200) and in-core instruments (10) are inserted through the guide holes (210).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KEPCO NUCLEAR FUEL CO LTD242 DAEDEOK-DAERO 989BEON-GIL YUSEONG-GU DAEJEON 305-353

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chun, Joo Hong Daejeon, KR 6 0
Eom, Kyong Bo Daejeon, KR 11 9
Ha, Dong Geun Daejeon, KR 11 9
Jeon, Sang Youn Daejeon, KR 5 0
Kim, Ba Leum Daejeon, KR 5 0
Kim, Jae Ik Daejeon, KR 33 18
Kim, Jin Sun Daejeon, KR 31 126
Kim, Seong Soo Daejeon, KR 33 131
Kwon, O Cheol Daejeon, KR 4 0
Lee, Hak In Daejeon, KR 3 0
Ryu, Joo Young Daejeon, KR 6 0
Ryu, Su Pil Daejeon, KR 6 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00