Method for producing platinum-based alloy powder

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10662506
APP PUB NO 20170226612A1
SERIAL NO

15501335

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for producing a platinum-based alloy powder, the method comprising a heat treatment of a mixed powder containing a platinum-based powder composed of at least one selected from the group consisting of platinum and platinum compound, a platinum group metal-based powder composed of at least one selected from the group consisting of iridium, rhodium, palladium, and compound containing at least one of them, and an alkaline-earth metal compound, wherein specific surface area of the platinum group metal-based powder is 30 m2/g or more and D90 of the mixed powder is 1.0 μm or less. According to the method for producing a platinum-based alloy powder of the invention, it is possible to produce a platinum-based alloy powder that has a desired particle diameter, also has a sharp particle size distribution, and has high purity and crystallinity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TANAKA KIKINZOKU KOGYO K K7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-6422

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawai, Takehiko Kanagawa, JP 1 2
Nagaoka, Akio Kanagawa, JP 3 3
Wagawa, Akitoshi Kanagawa, JP 8 24
Yamazaki, Takahisa Kanagawa, JP 18 140

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00