System for the production of panels made of wood flakes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10059029
APP PUB NO 20170225356A1
SERIAL NO

15519022

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for production of panels, particularly for the production of panels made of wood flakes comprising at least a support plane movable along a direction of forward movement, at least a first and a second forming machine arranged in succession to one another along the direction of forward movement above the support plane and each comprising at least a first set of distributor elements rotatable around respective axes, the distributor elements being able to select a flow of wooden material comprising short flakes and long flakes so as to allow the fall of the short flakes on the support plane and the dragging of the long flakes, where the first forming machine and the second forming machine comprise at least a second set of distributor elements operable independently of the relative first set and where the distributor elements of the first set are operable in rotation in both directions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IMAL S R L41126 SAN DAMASO (MO)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Benedetti, Paolo Modena, IT 40 230

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00