Quantum dots having a nanocrystalline core, a nanocrystalline shell surrounding the core, and an insulator coating for the shell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10763400
APP PUB NO 20170222098A1
SERIAL NO

15488322

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Semiconductor structures having insulators coatings and methods of fabricating semiconductor structures having insulators coatings are described. In an example, a method of coating a semiconductor structure involves adding a silicon-containing silica precursor species to a solution of nanocrystals. The method also involves, subsequently, forming a silica-based insulator layer on the nanocrystals from a reaction involving the silicon-containing silica precursor species. The method also involves adding additional amounts of the silicon-containing silica precursor species after initial forming of the silica-based insulator layer while continuing to form the silica-based insulator layer to finally encapsulate each of the nanocrystals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OSRAM OPTO SEMICONDUCTORS GMBH93055 REGENSBURG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kurtin, Juanita N Hillsboro, US 52 542
Zhao, Weiwen Happy Valley, US 19 179

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00