Optical lens

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9910252
SERIAL NO

15328872

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical lens includes a first lens (L1), a second lens (L2), a third lens (L3), and a fourth lens (L4), which are successively coaxially arranged along the transmission direction of incident light, wherein the first lens (L1) and the fourth lens (L4) are negative meniscus lenses, the second lens (L2) is a positive meniscus lens, and the third lens (L3) is a positive plano-convex lens. The optical lens can be applied to an optical system of a laser processing device, when a utilized processing wavelength is different from a monitoring wavelength, the imaging chromatic aberration in a monitoring system may be eliminated, particularly when a wavelength of the far infrared region is utilized as a wavelength for laser processing. When using the red light wavelength as the monitoring wavelength, the monitoring system can achieve a better imaging effect, thus ensuring the quality of laser processing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HAN'S LASER TECHNOLOGY INDUSTRY GROUP CO LTD518000 NO 9988 SHENNAN ROAD NANSHAN DISTRICT SHENZHEN GUANGDONG SHENZHEN CITY GUANGDONG PROVINCE 518000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gao, Yunfeng Shenzhen, CN 49 69
Huang, Hai Shenzhen, CN 143 1365
Li, Jiaying Shenzhen, CN 31 39
Sun, Bo Shenzhen, CN 325 2851
Zhou, Chaoming Shenzhen, CN 24 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00