Shell-and-tube type reactor for reforming natural gas and a preparation method of syngas or hydrogen gas by using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10632437
APP PUB NO 20170216806A1
SERIAL NO

15121971

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a shell-and-tube type reactor for reforming natural gas and a method for manufacturing syngas or hydrogen gas by using the same. According to the present invention, a shell-and-tube type reactor for reforming natural gas comprises a reaction catalyst for reforming natural gas, which is filled in a reactor shell; at least one tube for separating hydrogen; and a tube for an exothermic reaction or a tube type heat-exchanger for heating, which is disposed at the center of the reactor so as to have excellent operating efficiency and enable production of high-purity hydrogen and collection of carbon dioxide simultaneously along with a reaction.

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA INSTITUTE OF ENERGY RESEARCHDAEJEON 34129

International Classification(s)

loading....
  • 2015 Application Filing Year
  • C01B Class
  • 1749 Applications Filed
  • 1349 Patents Issued To-Date
  • 77.13 % Issued To-Date

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Han, Jae Yun Gyeonggi-do, KR 2 0
Lee, Jung Hyun Daejeon, KR 172 840
Ryi, Shin Kun Sejong, KR 3 1
Seo, Yong Seog Daejeon, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • C01B Class
  • 0 % this patent is cited more than
  • 5 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges43138072101 - 1011 - 2021 - 3071 - 800255075100125150175200225250275300325350375400425450475

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2031