Microbicide and method for manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10842153
APP PUB NO 20170215428A1
SERIAL NO

15500604

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method for manufacturing a microbicide having high microbicidal performance for eradicating microbes. This method for manufacturing a microbicide comprises: a step for preparing an inorganic aqueous solution containing an inorganic component having seawater as a raw material thereof, an ozone mixing step for mixing ozone into the inorganic aqueous solution, and a stirring step for stirring the inorganic aqueous solution mixed with ozone and passing through a bubble generation nozzle; wherein, the temperature of the inorganic aqueous solution in the ozone mixing step and the stirring step is 0° C. to 30° C., and when the amount of inorganic aqueous solution treated in the ozone mixing step and the stirring step is defined as X liters and the treatment rate of the ozone mixing step and the stirring step is defined as Y liters/minute, then the microbicide is manufactured by alternately repeating the ozone mixing step and the stirring step for A·X/Y minutes (where A is 30 or more).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OPT CREATION INCYOKOHAMA-SHI KANAGAWA 230-0045

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Misawa, Naoaki Miyazaki, JP 2 10
Takahashi, Tsunejiro Yokohama, JP 6 30
Yamaguchi, Hideki Yokohama, JP 112 2316

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 24, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 24, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00