Bisphenol alternative derived from renewable substituted phenolics and their industrial application

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10723684
APP PUB NO 20170210689A1
SERIAL NO

15313656

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A compound is provided according to structure 4, (4) wherein n has a value from 0 to 48 and Z is hydroxyl or a benzene ring bearing substituents R11-R15, wherein R1-R15 are each individually selected from the group consisting of H, allyl, alkyl, alkoxy, phenyl, phenoxy, halide, hydroxyl, glycidyl, (meth)acryloyl, 3-(meth)acryloyl-2-hydroxy-1-propoxy, 2,3-epoxypropyl, maleate, and structure (a) wherein at least one of R1-R5, at least one of R6-R10, and at least one of R11-R15 is hydroxyl or an ether or ester derived from it and one of the R6-R10 groups is replaced by a direct bond to the CXY group.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSITY OF DELAWAREOFFICE OF ECONOMIC INNOVATION AND PARTNERSHIPS 591 COLLABORATION WAY SECOND FLOOR NEWARK DE 19713

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hernandez, Eric David Blackwood, US 1 1
Lascala, John Joseph Wilmington, US 2 2
Reno, Kaleigh Havery Newark, US 1 0
Sadler, Joshua M Middle River, US 2 1
Stanzione,, III Joseph Francis Wilmington, US 1 1
Wool, Richard Patrick Newark, US 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 28, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 28, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00