Elastic roller

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9849699
SERIAL NO

15313637

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An elastic roller includes: a roller shaft; and an elastic member. The elastic roller includes an inner layer side elastic member, and a coating layer. The inner layer side elastic member includes a base layer and an intermediate layer located from the roller shaft in this order. The base and intermediate layers have a rubber hardness of 30 to 80 degrees that is measured by a durometer type A in accordance with the standard of JIS K 6253. The rubber hardness of the base layer is more than that of the intermediate layer. The coating layer is made of a silicone resin, and has a thickness of 10 to 100 μm. The silicone resin has a hardness of 20 degrees or less that is measured using a spring-based Asker C type in accordance with SRIS 0101 standard. The inner layer side elastic member has a plurality of internal grooves along a circumferential direction. Each of the internal grooves has a width of 25 to 1,300 μm, and has a depth of 25 to 500 μm. Each of the internal grooves has a V-shaped in cross section and has a groove angle of 50 to 120 degrees.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SATO HOLDINGS KABUSHIKI KAISHA3-1-1 SHIBAURA MINATO-KU TOKYO 1080023

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nitta, Haruhiko Hyogo, JP 16 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00