Truck process management tool for transport operations

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10613524
SERIAL NO

15381094

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process management tool for managing transport of a material between a first location and a second location is disclosed. The process management tool includes a communication device configured to receive data messages, a display device, an input device configured to receive user inputs, and a processor in communication with the communication device, the display device, and the input device. The processor is configured to generate a graphical user interface on the display device. The graphical user interface includes a map indicative of a position of each of one or more transport vehicles with respect to the first location and the second location. The graphical user interface further includes a first graphical object indicative of a spacing between a first transport vehicle and a second transport vehicle of the one or more transport vehicles and a second graphical object indicative of a process parameter associated with the material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CATERPILLAR PAVING PRODUCTS INC9401 85TH AVENUE N BROOKLYN PARK MN 55445-2199

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Marsolek, John Lee Watertown, US 29 278

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00