Method for manufacturing a component by a generative manufacturing process, apparatus for manufacturing a component by a generative manufacturing process, and medical implant generated for an individual patient

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10792854
APP PUB NO 20170203509A1
SERIAL NO

15327682

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for manufacturing a component (10) by a generative manufacturing process, wherein the component is entirely or partially produced from a liquid raw material (12), characterised in that the component is entirely or partially produced from a liquid raw material (12) that can solidify when heated, the raw material is discharged in liquid form into a manufacturing zone (1) and heated and hence solidified by a computer-controlled, targeted light spot, in that the point of incidence of a light beam (8) from a light beam source is continuously and/or gradually modified relative to the manufacturing zone (1).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MEDIZINISCHE HOCHSCHULE HANNOVERCARL-NEUBERG-STRASSE 1 HANNOVER 30625

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Doll, Theodor Bochum, DE 8 71
Stieghorst, Jan Nienhagen, DE 3 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 6, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 6, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00