Method, device and synthesis element for connecting an edge material to a workpiece

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10710268
APP PUB NO 20170203464A1
SERIAL NO

15326787

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a method for connecting a connecting face of an edge material to a connecting face of a workpiece by a synthesis element, including the steps: of making available the workpiece, feeding the synthesis element, which is made available by at least one function film composed of an adhesive, activating the adhesive function film, applying the synthesis element to one of the connecting faces, connecting the synthesis element to the other of the connecting faces, wherein the workpiece and the edge material are connected by the synthesis element located between them. Furthermore, there is disclosed a synthesis element and a device for connecting a connecting face of an edge material to a connecting face of a workpiece.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HOMAG GMBH72296 SCHOPFLOCH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Compera, Christian Schonau, DE 23 181
Flik, Markus Stuttgart, DE 10 186
Petrak, Axel Horb, DE 7 8
Schmid, Johannes Starzach, DE 111 667

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 14, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00