Skate and method of manufacture

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10897952
APP PUB NO 20170202298A1
SERIAL NO

15479676

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A skate boot shell including a tridimensional outer sub-shell made of a first material, the outer sub-shell including a first sole portion connected to first heel, ankle and side portions; a tridimensional inner sub-shell received within and connected to the outer sub-shell, an outer surface of the inner sub-shell being complementary to an inner surface of the outer sub-shell, the inner sub-shell being made of a second material different from the first material; and a tridimensional reinforcement sub-shell made of a third material different from the first and second materials and bonded inside at least one of the inner and outer sub-shells.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SPORT MASKA INC8275 ROUTE TRANSCANADIENNE BUREAU B110 SAINT-LAURENT QUÉBEC H4S 0B6 H4S 0B6

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Champagne, Etienne Saint-Joseph-de-Beauce, CA 13 34
Chartrand, Daniel Lorraine, CA 30 646
Chretien, Alexandre Laval, CA 10 138
Koyess, Philippe Orford, CA 32 327
Lapierre, Philippe Montreal, CA 20 58

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 26, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 26, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00