Device and method for adjusting fuel supply advance angle of multi-cylinder diesel engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9926855
SERIAL NO

15316757

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device and method for adjusting a fuel supply advance angle of a multi-cylinder diesel engine includes a gear chamber, a connecting disc and a fuel pump, wherein the gear chamber and the connecting disc are in the diesel engine, and the fuel pump is at a left end surface outside the gear chamber. A main shaft end of the fuel pump extends into the gear chamber. A right end surface of the connecting disc connects to a timing gear. A right end surface of the timing gear has three penetrating circular-arc waist-shaped holes. Annular sizing blocks are arranged on the waist-shaped holes. A penetrating circular hole is at a tail end of the waist-shaped holes. The circular hole is provided with a T-shaped nut. A support screw is arranged in the T-shaped nut, and the screw head of the support screw is jacked against the annular sizing block.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JIANGSU UNIVERSITY OF SCIENCE AND TECHNOLOGYMENG XI ROAD 212003 ZHENJIANG CITY OF JIANGSU PROVINCE JINGKOU DISTRICT NO 2 ZHENJIANG CITY JIANGSU PROVINCE 212003

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Qinfeng Jiangsu, CN 4 15
Liu, Yan Jiangsu, CN 664 5733
Qi, Jiyang Jiangsu, JP 1 0
Su, Shijie Jiangsu, CN 9 18
Tang, Wenxian Jiangsu, CN 17 29
Yan, Fei Jiangsu, CN 36 117
Yao, Kai Jiangsu, CN 7 64
Zhang, Jian Jiangsu, CN 1504 17611
Zhu, Yongmei Jiangsu, CN 6 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00