Nitrogen injection for ARC lamps

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10966286
APP PUB NO 20170196046A1
SERIAL NO

15380139

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for reducing contamination of one or more arc lamps are provided. One example implementation is directed to a millisecond anneal system. The millisecond anneal system includes a processing chamber for thermally treating a substrate using a millisecond anneal process. The system further includes one or more arc lamps. Each of the one or more arc lamps is coupled to a water loop for circulating water through the arc lamp during operation of the arc lamp. The system includes a reagent injection source configured to introduce a reagent, such as nitrogen gas, into water circulating through the arc lamp during operation of the arc lamp.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MATTSON TECHNOLOGY INC47131 BAYSIDE PARKWAY FREMONT CA 94538
BEIJING E-TOWN SEMICONDUCTOR TECHNOLOGY CO LTDNO 8 BUILDING NO 28 JINGHAI ER RD BEIJING 100176

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bremensdorfer, Rolf Bibertal, DE 26 18
Camm, Dave Vancouver, CA 6 33
Cibere, Joseph Burnaby, CA 22 118
Lembesis, Pete Langley, CA 6 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00