Features for improving process uniformity in a millisecond anneal system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10770309
APP PUB NO 20170194163A1
SERIAL NO

15378580

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for improving process uniformity in a millisecond anneal system are provided. In some implementations, a process for thermally treating a substrate in a millisecond anneal system can include obtaining data indicative of a temperature profile associated with one or more substrates during processing in a millisecond anneal system. The process can include one or more of (1) changing the pressure inside the processing chamber of the millisecond anneal system; (2) manipulating the irradiation distribution by way of the refracting effect of a water window in the millisecond anneal system; (3) adjusting the angular positioning of the substrate; and/or (4) configuring the shape of the reflectors used in the millisecond anneal system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MATTSON TECHNOLOGY INC47131 BAYSIDE PARKWAY FREMONT CA 94538
BEIJING E-TOWN SEMICONDUCTOR TECHNOLOGY CO LTDNO 8 BUILDING NO 28 JINGHAI ER RD BEIJING 100176

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cosceev, Alexandr Lonsee, DE 7 12
Hagedorn, Markus Ulm, DE 12 37
Pfahler, Christian Ulm, DE 9 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00