Method and apparatus for managing power flow between an alternate energy source and a storage device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10331157
APP PUB NO 20170192445A1
SERIAL NO

15394978

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system that efficiently captures and utilizes the maximum generation capacity of an alternate energy source is disclosed. A first power converter is provided between the alternate energy source and a load. The first power converter is selected such that the capacity of the power converter is less than the generation capacity of the alternate energy source. A second power converter is selected such that the capacity of the second converter is at least equal to the difference between the capacity of the alternate energy source and the first power converter. A battery is provided to store the additional energy generated by the alternate energy source, and the second power converter is connected between the output of the alternate energy source and the battery. The power output from the first power converter is utilized to control operation of the second power converter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FAITH TECHNOLOGIES INC201 MAIN ST PO BOX 260 MENASHA WI 54952

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dennis, Kevin Waukesha, US 16 254
Laubenstein, Thomas A Waukesha, US 2 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00