Power generating system using current around structural body

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10920746
APP PUB NO 20170191463A1
SERIAL NO

15188161

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a power generating system utilizing current around a structural body. The power generating system is disposed in a flow field, wherein the streams of the flow field flow along a main fluid flow direction. The power generating system comprises a supporting device and a power generating device. The supporting device comprises a supporting body, wherein at least one of a stream-facing region, a side-stream region, and a vortex region is defined on the supporting body. The power generating device comprises at least one power generating unit and a power storage unit, wherein the power generating unit is disposed in at least one of the stream-facing region, the side-stream region, and the vortex region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL APPLIED RESEARCH LABORATORIES3F NO 106 HO-PING E RD SEC 2 TAIPEI CITY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Kuo-Chun Taipei, TW 15 45
Chiang, Chi-Heng Taipei, TW 1 0
Huang, Ping-Hsun Taipei, TW 2 8
Lai, Jihn-Sung Taipei, TW 8 16
Lin, Yung-Bin Taipei, TW 8 14
Tsai, Yuan-Shiang Taipei, TW 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00