Rewritable multibit non-volatile memory with soft decode optimization

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9946468
SERIAL NO

15459578

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A non-volatile memory system including multi-level storage optimized for ramp sensing and soft decoding is provided. Sensing is performed at a higher bit resolution than an original user data encoding to improve the accuracy of reading state information from non-volatile storage elements. Higher resolution state information is used for decoding the original user data to improve read performance through improved error handling. Ramp sensing is utilized to determine state information by applying a continuous input scanning sense voltage that spans a range of read compare points. Full sequence programming is enabled as is interleaved coding of the user data over all of the data bit sets associated with the storage elements.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SANDISK TECHNOLOGIES INC951 SANDISK DRIVE LEGAL DEP MILPITAS CA 95035

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alrod, Idan Herzliya, IL 243 7723
Cernea, Raul-Adrian Santa Clara, US 131 7455
Conley, Kevin Michael San Jose, US 3 40
Sharon, Eran Rishon Lezion, IL 328 9035

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00