Beam shaping of high intensity high frequency optical output

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9851570
SERIAL NO

15459323

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical output coupler includes an uncoated plano-concave lens having a planar side and a concave side. An optical axis of the plano-concave lens is tilted at or near a Brewster angle relative to a beam axis. A first optical element is configured to focus a beam of radiation emerging from the planar side of the plano-concave lens along a first axis that is perpendicular to the beam axis. The first optical element is disposed between the planar side of the plano-concave lens and a second optical element. The second optical element is configured to focus a beam of radiation emerging from the planar side of the plano-concave lens along a second axis that is perpendicular to the beam axis, wherein the second axis is different from the first axis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IPG PHOTONICS CORPORATION377 SIMARANO DRIVE MARLBOROUGH MA 01752

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kmetec, Jeffery D Palo Alto, US 1 0
von, Dadelszen Michael Merrimack, US 23 108

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00