Boost converter maximal output power detector allowing optimal dynamic duty-cycle limitation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9917506
SERIAL NO

14975138

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and apparatus for detecting a critical duty cycle that maximizes an output power of a boost converter is provided. In the method and apparatus, the boost converter may be operated at or below the critical duty cycle. In the method and apparatus, a first voltage that is a function of an output voltage of a boost converter and voltage drops across a first set of parasitic resistances of the boost converter is detected. A second voltage that is a function voltage drops across a second set of parasitic resistances of the boost converter is also detected. The voltages are compared to determine the critical duty cycle and the boost converter is operated in accordance with a duty cycle that does not exceed the critical duty cycle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STMICROELECTRONICS INTERNATIONAL N VCHEMIN DU CHAMP-DES-FILLES 39 PLAN-LES-OUATES GENEVA 1228

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Michal, Vratislav Grenoble, FR 30 58

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00