LED lighting apparatus and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9859482
SERIAL NO

15448041

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To provide an LED lighting apparatus and a method for manufacturing the same that can improve the bonding strength between an aluminum substrate and a printed wiring substrate. An LED lighting apparatus and a method for manufacturing the same, the LED lighting apparatus includes an aluminum substrate, a plurality of reflectivity-enhanced layers formed on the aluminum substrate, an LED device bonded on said plurality of reflectivity-enhanced layers, a printed wiring substrate bonded onto a region on the aluminum substrate other than a region where the plurality of reflectivity-enhanced layers are formed, a wire for connecting between the printed wiring substrate and the LED device, a frame member formed so as to surround said LED device, and a phosphor resin deposited over a region inside the frame member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CITIZEN ELECTRONICS CO LTD23-1 KAMIKURECHI 1-CHOME FUJIYOSHIDA-SHI YAMANASHI 403-0001
CITIZEN WATCH CO LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imai, Sadato Yamanashi, JP 62 1250
Katoh, Tatsuya Ebina, JP 31 152

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00