Process for preparing dichloropropanol

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850190
SERIAL NO

15263727

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a process of preparing dichloropropanol, DCP. The process includes the step of: subjecting a three-carbon material to a first chlorination reaction with an aqueous hydrochloric acid solution in the presence of a carboxylic acid catalyst; adding the three-carbon material into the first mixture solution to undergo a second chlorination reaction and obtain a second mixture solution containing less than 13 wt % of hydrochloric acid; distilling the second mixture solution; and purifying the overhead product by oil-water separation to obtain DCP from the oil phase. By lowering the concentration of the hydrochloric acid contained in the mixture to be distilled, the DCP product can be straightly obtained via distillation and oil-water separation, thereby effectively simplifying the process of preparing DCP.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHANG CHUN PLASTICS CO LTD7 FL NO 301 SONGKIANG ROAD TAIPEI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chan, Cheng-Hui Taipei, TW 1 0
Huang, Chien-Fu Taipei, TW 96 623

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00