Seamless switchover system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10332708
APP PUB NO 20170169976A1
SERIAL NO

15355113

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method provide seamless control switchover through an input coupled to a power line and a safety apparatus that actuates if the input remains de-energized for a first time interval. Each of a plurality of subsystems has a control unit that controls a power source to energize the power line and is capable of transitioning between master and slave states. A first switch or second and third switches in series couple the power source to the power line. The first switch is closed during master state operation. The second switch is closed during slave operation and the third switch is open if any subsystem control unit is in master state. The system is configured to open or close the first switch, the second switch, or the third switch responsive to a transition of a control unit to or from master state within the first time interval.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI RAIL GTS CANADA INCTORONTO ONTARIO M3B 0A4

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanner, Abe Toronto, CA 23 142
Lungu, Mihai Toronto, CA 3 10
Zhao, Janice Toronto, CA 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00