Cutting process simulation method and system thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10860751
APP PUB NO 20170169158A1
SERIAL NO

15303929

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a cutting process simulation method and a system thereof which can efficiently optimize the decommissioning process of a nuclear facility, thereby saving costs and time and ensuring safety in the decommissioning process. The cutting process simulation system, according to one embodiment of the present invention, may comprise: a display unit: and a control unit which cuts a cutting target in a nuclear facility by using a design program, displays the cut shape on the display unit, and predicts the amount of secondary waste generated in the process of cutting the cutting target.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA ATOMIC ENERGY RESEARCH INSTITUTE111 DAEDEOK-DAERO 989BEON-GIL YUSEONG-GU DAEJEON 34057

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Byung Seon Daejeon, KR 2 1
Hyun, Dong Jun Daejeon, KR 3 9
Jeong, Kwan Seong Sejong, KR 1 1
Kim, Geun Ho Daejeon, KR 62 623
Kim, Ik June Daejeon, KR 1 1
Lee, Jong Hwan Daejeon, KR 69 530
Moon, Jei Kwon Daejeon, KR 4 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00