Braided, reflective textile sleeve and method of construction thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11421356
APP PUB NO 20170167062A1
SERIAL NO

15530182

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A braided textile sleeve having a flexible, seamless, reflective tubular wall and method of construction thereof are provided. The tubular wall extends along a longitudinal axis between opposite open ends and includes a first set of yarns and a second set of yarns braided with one another. The first and second yarns are provided as different types of yarns from one another and are braided in opposite helical directions with one another. The tubular wall includes a third set of yarns captured between the first and second sets of yarns, with the third set of yarns extending substantially parallel to the longitudinal axis. The sleeve includes a reflective outer layer fixed to an outer surface of the braided yarns.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FEDERAL-MOGUL POWERTRAIN LLC15701 TECHNOLOGY DRIVE NORTHVILLE MI 48168

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gao, Tianqi Exton, US 35 201
Ge, Qingtong Exton, US 3 15
Malloy, Cassie M Trappe, US 34 401
Muela, Edgar El Paso, US 2 6
Winters, Danny Downingtown, US 13 157

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 23, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 23, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 23, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00