Scroll compressor with controlled pressing force

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10330098
APP PUB NO 20170159658A1
SERIAL NO

15321626

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A scroll compressor, includes: a scroll compression mechanism including an orbiting scroll, a fixed scroll, and a thrust plate supporting a load of the orbiting scroll in a thrust direction; a back-pressure application mechanism that applies, as back pressure, the refrigerant gas compressed by the scroll compression mechanism to a rear surface of the thrust plate; and a floating amount restriction mechanism that restricts an amount of floating of the thrust plate caused by the back pressure. The floating amount restriction mechanism includes a restriction pin that includes a shaft part and a head part, and locks the thrust plate to the head part to restrict the amount of floating. The shaft part passes through the thrust plate and has a front end part fixed to a front housing, and the head part has a diameter larger than a diameter of the shaft part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES THERMAL SYSTEMS LTDSANTINGMU NO 2 FAN NO 3 TAKESHITA PILLS THE CAPITAL OF TOKYO JAPAN TOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ohta, Masahiro Tokyo, JP 174 734
Takeuchi, Makoto Tokyo, JP 229 3253
Watanabe, Kazuhide Kiyosu, JP 49 467

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00