Method and hardware for supplying additives to the delayed coker drum

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10676675
APP PUB NO 20170158963A1
SERIAL NO

15393154

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for supplying additives into a coker drum includes an inlet for supplying a hydrocarbon feed stream into the coker drum and conduits along the circumference of walls of the coker drum. Each conduit has an injection nozzle to supply additives inside the coker drum. An injection control system controls the operation of the injection nozzles such that 1) one or more of the injection nozzles placed within a first distance above a vapour liquid interphase of the hydrocarbon feed stream are configured to supply the additives; and 2) supply of the additive discontinues from a particular injection nozzle when a distance between the injection nozzle and the vapour liquid interphase is less than or equal to a second distance. The apparatus optionally includes a mechanical drive system moving at least one of the conduits based on the level of the vapour liquid interphase in the coker drum.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INDIAN OIL CORPORATION LIMITED400051 MUMBAI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bhattacharyya, Debasis Faridabad, IN 62 310
Devi, Prasad Terapalli Hari Venkata Faridabad, IN 3 1
Kumar, Brijesh Faridabad, IN 60 468
Rajagopal, Santanam Faridabad, IN 35 111
Ramachandran, Pradeep Ponoly Faridabad, IN 3 1
Thakur, Ram Mohan Faridabad, IN 27 95
Thapa, Gautam Faridabad, IN 8 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 9, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 9, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00