Water nozzle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9855567
SERIAL NO

15369925

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A water nozzle with a flow head is provided with at least two separate water supply devices that supply, in a controllable fashion, different water volume flows to the flow head. The flow head generates an annular jet from the different water volume flows. By controlling the water volume flows, alternatively a slim annular jet or a widened annular jet is generated by the flow head. A deflection element with a central outlet opening is provided, wherein the central outlet opening is arranged in a flow direction of the annular jet downstream of and spaced apart from the flow head. A deflection device surrounds the central outlet opening. A diameter of the central outlet opening is designed such that the slim annular jet is able to pass through the central outlet opening while the widened annular jet impacts on the deflection device surrounding the central outlet opening.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OASE GMBH48477 HÖRSTEL-RIESENBECK

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wesselmeier, Reinhard Hörstel, DE 6 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00