Plasma CVD device and method of manufacturing magnetic recording medium

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10657999
APP PUB NO 20170133048A1
SERIAL NO

15319149

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A plasma CVD device includes a chamber (102), an anode (104), a cathode (103), a holding portion which holds a substrate to be deposited (101) a plasma wall (88) an anti-adhesion member (91) which is arranged between a first gap (81) between the anode and the plasma wall and a first inner surface (102a) of the chamber and a pedestal (92) which is arranged between the anti-adhesion member and a back surface of the anode and which is electrically connected to the anode. The maximum diameter of each of the first gap, a second gap (82) between the anode and the anti-adhesion member, a third gap (83) between the back surface of the anode and the pedestal, a fourth gap (84) between the plasma wall and the anti-adhesion member and a fifth gap (85) between the anti-adhesion member and the pedestal is equal to or less than 4 mm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JAPAN CREATE CO LTD1-203-4 HAYASHI TOKOROZAWA-SHI SAITAMA 359-1167

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abe, Kouji Chiba, JP 19 165
Honda, Yuuji Chiba, JP 53 491
Okudaira, Kohei Chiba, JP 3 4
Sekino, Hiroyasu Chiba, JP 1 1
Tanaka, Masafumi Chiba, JP 55 934
Watanabe, Toshiyuki Chiba, JP 201 1981

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 19, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 19, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00