Fetch ahead branch target buffer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10664280
APP PUB NO 20170132009A1
SERIAL NO

14935579

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fetch ahead branch target buffer is used by a branch predictor to determine a target address for a branch instruction based on a fetch pointer for a previous fetch bundle, i.e. a fetch bundle which is fetched prior to a fetch bundle which includes the branch instruction. An entry in the fetch ahead branch target buffer corresponds to one branch instruction and comprises a data portion identifying the target address of that branch instruction. In various examples, an entry also comprises a tag portion which stores data identifying the fetch pointer by which the entry is indexed. Branch prediction is performed by matching an index generated using a received fetch pointer to the tag portions to identify a matching entry and then determining the target address for the branch instruction from the data portion of the matching entry.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MIPS TECH LLC3201 SCOTT BLVD SANTA CLARA CA 95054

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Patel, Sanjay San Ramon, US 151 3472
Pota, Parthiv Cupertino, US 7 11
Ranganathan, Sudhakar Santa Clara, US 4 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00