Multifunctional aerodynamic, propulsion, and thermal control system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10018456
SERIAL NO

14936760

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An open-loop thermal control system and method for components that generate heat includes a reservoir for containing a pressurized working fluid, a first heat exchanger in thermal communication with the working fluid, a Joule-Thomson expansion valve in fluid communication with the reservoir, and a second heat exchanger in fluid communication with the valve. The first heat exchanger is configured to transfer heat from the components to the fluid in the reservoir. The valve is configured to expand the working fluid into a two-phase fluid having a primary use of cooling. The second heat exchanger is configured to receive heat from the components and receive the two-phase fluid. The second heat exchanger provides a single-phase working fluid for at least one secondary use before the working fluid is expelled from the thermal control system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • RAYTHEON COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Danforth, Jeremy C Tucson, US 26 111
Lyons, Paul M Tucson, US 7 15
Summers, Matt H Marana, US 21 88
Vollin, Jeff L Tucson, US 4 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 10, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 10, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00