Shovel
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jul 7, 2020
Grant Date -
May 11, 2017
app pub date -
Jan 19, 2017
filing date -
Jul 30, 2014
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A shovel includes a lower traveling body, an upper rotating body, an attachment including a boom and an arm, a controller, an engine, and a hydraulic pump that is driven by the engine and discharges hydraulic oil to drive the attachment. The controller is configured to obtain a hydraulic load applied to the attachment and calculate an engine speed command at predetermined time intervals based on the obtained hydraulic load.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
SUMITOMO HEAVY INDUSTRIES LTD | TOKYO JAPAN TOKYO METROPOLIS | |
SUMITOMO(S H I ) CONSTRUCTION MACHINERY CO LTD | TOKYO JAPAN TOKYO METROPOLIS |
International Classification(s)

- 2017 Application Filing Year
- F02D Class
- 1689 Applications Filed
- 1333 Patents Issued To-Date
- 78.93 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Kitajima, Daisuke | Chiba, JP | 10 | 118 |
# of filed Patents : 10 Total Citations : 118 | |||
Matsuzaki, Eisuke | Kanagawa, JP | 6 | 29 |
# of filed Patents : 6 Total Citations : 29 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 1 Citation Count
- F02D Class
- 36.89 % this patent is cited more than
- 5 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jan 7, 2028 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jan 7, 2032 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
