Method for fabrication of a gold alloy wire

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10471486
APP PUB NO 20170128992A1
SERIAL NO

15342270

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Method for fabrication of a gold alloy wire:

    an alloy is prepared including from 33.33% to 45.83% Au, from 3.64% to 12.44% Zn, from 18.46% to 45.02% Cu, from 9.88% to 33.78% Ni, and from 0.0 to 5.0% of elements from among Ir, In, Ti, Si, Ga, Re,a continuous cast bar is produced, having a diameter of 8.0 to 20.0 mm,this bar is wire rolled while limiting the cross-section deformation to less than 20% per pass, preferably 13%,the cumulative deformation compared to the initial cross-section is measured,the wire rolling is stopped when the cumulative deformation reaches 60% to 75%, an anneal is performed,the wire rolling is started again and the wire rolling, measuring, annealing process is repeated until the desired cross-section is achieved,the intermediate product is drawn to obtain a section wire of circular cross-section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIVAROX-FAR S A2400 LE LOCLE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Charbon, Christian Chezard-St-Martin, CH 77 144
Vincent, Denis Neuchatel, CH 21 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00